Technology / Lunar Infrastructure

ITU opens a global spectrum track for lunar communications—but WRC-27 must set the rules

ITU member states have adopted the organization’s first Plenipotentiary resolution dedicated to lunar exploration, backing coordinated communications on and around the Moon. The decision raises lunar infrastructure on the global telecom agenda without yet allocating frequencies.

INNOVOX News DeskNov 26, 2026 · 6 min read
Curved, sunlit edge of the Moon showing rugged craters and deep basins against black space, photographed from NASA’s Orion spacecraft
NASA/Artemis II · NASA Media Usage Guidelines

The story

The International Telecommunication Union’s 194 member states have placed lunar communications on the organization’s top-level policy agenda, adopting the first ITU Plenipotentiary Conference resolution dedicated to lunar exploration. Approved on November 26 at the PP-26 conference in Doha, the measure calls for coordinated radiocommunication solutions for missions on and around the Moon. It is a governance milestone, but not a frequency allocation or a licence to operate.

According to the ITU, the resolution is intended to support links between the lunar surface and orbit while promoting efficient spectrum use, compatibility with existing radio services and protection from harmful interference. Those goals reach beyond a single spacecraft. Future lunar activity is expected to require communications, navigation, remote sensing and scientific data links among landers, rovers, orbiters and Earth stations, potentially operated by governments and companies using different technical systems.

The coordination challenge is no longer hypothetical. The ITU says ten countries have submitted radio-frequency filings for lunar or lunar-orbit projects. A filing starts an international coordination process under the Radio Regulations, the treaty that governs spectrum and satellite-orbit use; it does not confer ownership of lunar spectrum or guarantee that a proposed network can operate without constraints. As deployments multiply, incompatible assumptions about power, bandwidth and coverage could create interference well before the Moon resembles a mature telecom market.

The new resolution therefore strengthens an existing technical track rather than finishing it. ITU Radiocommunication Sector experts in Study Group 7 and Working Party 7B are examining requirements, sharing and compatibility, and possible regulatory provisions for lunar systems. Working Party documents published in 2026 show draft conference-preparatory work tied to World Radiocommunication Conference 2027 agenda item 1.15, the formal route through which governments will consider possible changes.

That agenda originates in WRC-23 Resolution 680. The 2023 conference asked the ITU-R to study possible new or modified space-research allocations for communications between stations on the lunar surface and spacecraft in lunar orbit. The mandate also recognizes navigation and timing, point-to-multipoint surface networks, radio astronomy and the need to protect the shielded zone of the Moon—a region naturally insulated from much terrestrial radio noise and potentially valuable for sensitive observations.

No new band was created in Doha. The Plenipotentiary Conference sets broad strategy and direction, while a World Radiocommunication Conference can revise the treaty-level frequency table and related rules. Independent reporting by BusinessDay likewise noted that the resolution does not itself establish allocations or a complete regulatory framework. That distinction matters because calling the vote “Moon regulation” would overstate both its legal effect and the technical work still required.

The United Kingdom’s Technical Framework on Lunar Operations, published this week, illustrates why governments want that work to begin early. It advises operators to plan spectrum and coordination from the initial mission-design stage and identifies WRC-27 as a key point in the developing international framework. Radio choices are difficult to retrofit: antenna design, filters, power budgets and network architecture can all depend on the bands and interference limits a mission expects to use.

INNOVOX analysis: lunar connectivity is becoming a shared-infrastructure problem before it becomes a mass-market service. The most consequential part of the ITU decision is its timing. Common assumptions agreed before congestion can encourage interoperable equipment and make smaller missions less dependent on proprietary end-to-end networks. Conversely, vague rules could reward early, powerful transmitters and leave science missions or emerging space nations paying to engineer around them.

What to watch next is the evidence feeding WRC-27. Technical studies must show which candidate bands can support lunar links without disrupting existing satellite, terrestrial and scientific services. Delegates will also have to separate urgent operational needs from speculative demand, define how lunar filings are coordinated, and protect radio-quiet science. The Doha resolution creates political backing for that process; the hard decisions on frequencies, coexistence and enforceable provisions remain ahead.

INNOVOX analysis

The resolution moves lunar communications from mission-by-mission engineering toward shared infrastructure governance. Its immediate value is not a new band or licence, but a mandate to develop coexistence rules before competing navigation, science and commercial systems crowd the same radio environment. Early coordination can reduce both interference risk and the cost of designing equipment that later proves incompatible.

What to watch

Watch ITU-R Study Group 7 and Working Party 7B work on sharing and compatibility, the Conference Preparatory Meeting text for WRC-27 agenda item 1.15, possible space-research allocations, safeguards for radio astronomy and the Moon’s shielded zone, and whether national licensing practices converge around the emerging framework.